Can data from an AB/S 1.1 be adopted in an ABL/S 2.1?

Carolina Bachenheimer-Schaefer
05.10.2016 14:06

It is possible to transfer project data out of an AB/S 1.1 into an ABL/S 2.1.
The prerequisite for this is that the data from AB/S 1.1 was already converted for the application version 1.4. The AB/S data in the ABL/S can then be converted in the ABL/S 2.1 plug-in “Import from logic time 200 EA”. The ABL/S plug-in lists all AB/S devices for which conversion is possible.

Tags: KNX, KNX, Logic, TP
Average rating: 0 (0 Votes)

You cannot comment on this entry